Views: 4 Author: Site Editor Publish Time: 2021-08-16 Origin: Site
A single-track electric chain hoist is not for permanent use. It has a certain technical content. How to disassemble, how to replace, every step must be very careful, and in strict accordance with the regulations and plans.
1: In the process of disassembly and assembly, the division of labor and collocation of several people, who disassembles and assembles, who connects the equipment, who tightens the screws, must be planned, and all personnel must wear helmets, and there must be a commander under unified scheduling.
2: Clean up the obstacles on the site, it is not easy to operate, high-altitude personnel wear safety anti-fall devices to prevent falling, wear a safety helmet on their heads, and hang a tool bag on their bodies. Do not transfer tools at will to prevent them from falling.
3: It is necessary to check whether the equipment is in good condition before disassembling and assembling. Be careful not to damage the equipment during disassembling and assembling, and handle with care to prevent it from falling.
4: When the staff walks on the rail beam, they should not wear their pants to prevent the equipment from being hooked and causing the device to fall.
The above are the technical requirements for replacing the monorail electric chain hoist in the air-conditioned cold water room.